An Orlando infill site checklist for the first week
· Development
Gather the parcel records, flag site constraints, and bring better questions to an early planning conversation.
Start with the parcel and the local jurisdiction
Write down the parcel ID, street address, current use and proposed use. Confirm who regulates the site. An Orlando mailing address can fall outside city limits, and the correct planning office changes the questions and the process.
Collect the survey if one is available, the recorded plat, and any documents that describe access or easements. Put the zoning and future land use designations side by side. Record where each item came from so the team can check it later.
Sketch the constraints before drawing the building
On a single sketch, mark the public street, likely points of access, obvious grade changes, and the areas you may need for stormwater, utility service and construction staging. Check the FEMA flood map as an early screening step. Ask the civil engineer what site conditions still need field verification.
Write a short list of what could move the building footprint or change the budget. Examples include a utility extension, an access restriction or a drainage requirement. Give each item an owner and a next action. Keep allowance amounts separate from items already priced by the team.
Use the planning conversation to decide what to study next
For a site in the City of Orlando, a pre-application meeting gives you a place to ask how the proposed use relates to that parcel and what reviews may apply. Bring the parcel ID, a simple concept sketch and your three biggest questions.
After the meeting, document the issues that remain open and specify what would change your decision to proceed. The first week should leave you with a better scope for due diligence and a clearer basis for deciding what to spend next.
Sources
Related River Business resources
Request email updates · Discuss a project with River Business